Contractors and engineers typically use the following submittals in construction projects:

November 19, 2025


  • Product Data: Specs for HVAC units, pumps, pipes, lighting, etc.
  • Shop Drawings: Detailed installation drawings for ducts, piping, electrical, and controls.
  • Material Samples: Paint, tiles, flooring, glass, metal finishes.
  • Equipment Submittals: Chillers, AHUs, boilers, generators, transformers.
  • BAS/Controls Submittals: Sequences, riser diagrams, I/O summaries, network layouts.
  • Certificates & Test Reports: UL approvals, factory tests, pressure tests.
  • Mock-ups: Bathroom mock-ups, façade sections.
  • Closeout Submittals: As-built drawings, O&M manuals, warranties.