Managing submittals in a large construction project can quickly become overwhelming—hundreds of documents, multiple contractors, complex review cycles, and strict deadlines. The key to success is building a streamlined, transparent, and well-organized submittal workflow. Here are the most effective tips to keep your submittal process running smoothly:

  1. Start With a Complete Submittal Register

Before work begins, create a detailed submittal register based on project specifications.
Include:

  • All required submittals for every division
  • Due dates
  • Responsible contractors
  • Review durations
  • Long-lead items

A complete register prevents surprises later in the project.

  1. Prioritize Long-Lead and Critical Equipment

Identify items that may impact schedule, such as:

  • Chillers, AHUs, generators
  • Custom equipment
  • BAS/controls submittals
  • Electrical switchgear

Request these early to avoid delays during installation.

  1. Use Standardized Templates

Provide standardized templates for:

  • Submittal requests
  • Shop drawings
  • Product data
  • RFI coordination
  • Transmittals

Uniform formats reduce confusion and save review time.

  1. Automate Tracking With Software

Large projects benefit significantly from digital platforms like:

  • Procore
  • Autodesk Construction Cloud
  • Submittal Link
  • PlanGrid / Build
  • Asana or Monday.com (for smaller teams)

Software helps automate reminders, track status in real time, and manage approvals without email overload.

  1. Centralize All Communication

Avoid scattered communication across email threads.
Use:

  • A shared drive
  • Project management tools
  • Cloud-based document storage

This keeps the latest version accessible to everyone.

 

  1. Set Clear Review Workflows

Define the workflow stages:

  • Contractor → General Contractor
  • GC → Consultant / Architect
  • Consultant → Client (if required)

Assign timelines and responsibilities for each step to avoid bottlenecks.

  1. Enforce Cutoff Dates

Large projects must have:

  • Submittal submission cutoff
  • RFI cutoff
  • Product substitution cutoff

This prevents last-minute surprises and improves project control.

  1. Use Version Control

Ensure every submittal has:

  • Revision numbers
  • Tracking codes
  • Updated dates
  • Marked changes

Version control prevents mistakes and rework.

  1. Hold Weekly Submittal Review Meetings

A short weekly review helps:

  • Track pending and overdue submittals
  • Resolve bottlenecks
  • Coordinate between GC, engineers, and subcontractors

Regular check-ins keep the submittal flow moving.

  1. Keep Detailed Logs and Documentation

Maintain an up-to-date submittal log with:

  • Status
  • Dates
  • Reviewer comments
  • Revisions
  • Responsible parties

This becomes critical during audits, disputes, or closeout.

  1. Communicate Expectations Early

Contractors should know:

  • Required formats
  • Required certifications
  • Number of copies (if physical)
  • Review duration
  • Submission sequence

Clear expectations prevent delays and resubmissions.

  1. Archive Everything Properly for Closeout

Collect and organize:

  • Approved submittals
  • As-built drawings
  • O&M manuals
  • Warranty documents

Proper archiving supports a smooth project closeout and turnover.

Final Thoughts

Efficient submittal management is essential for keeping large construction projects on schedule. By using digital tools, establishing clear workflows, prioritizing critical items, and maintaining transparent communication, project teams can avoid delays, reduce rework, and deliver a well-coordinated final product.