BMS graphics are the visual screens used to monitor and operate a Building Management System. They bring equipment diagrams, temperatures, operating status and other available control points into a view that helps facility teams understand their HVAC systems.
For a controls contractor, a useful graphic must match the installed equipment and its control sequence. For an operator, it should make the next step clear: identify the affected system, check its current condition and investigate the relevant alarm or trend.
A building may have air handling units, rooftop units, VAV boxes, fan coil units, pumps and central plant equipment. Each system needs a screen suited to the way it operates. An AHU graphic, for example, should help the operator follow the airflow path and locate the sensors, dampers, coils and fan.
Depending on the installed controls and available points, an AHU screen may display fan command and proven status, supply air temperature and setpoint, cooling valve command, damper position, filter alarm and operating mode. Label commands and feedback separately. A valve command of 100% does not confirm that the physical valve is fully open unless position feedback is available.
A 2D schematic is useful when the priority is a compact view of the system and its control relationships. Custom 3D HVAC graphics can help users recognise equipment and understand the arrangement of its components. The appropriate format depends on the operator, display size and complexity of the installation.
Whichever style you choose, keep live values readable. Equipment labels, units and alarm indications should remain easy to find without being hidden by decorative details.
Consider an illustrative AHU screen showing a supply air temperature of 18°C against a 13°C setpoint, a cooling valve command of 100% and a proven running fan. These values show that the controller is requesting cooling while the measured supply air temperature remains above setpoint.
The graphic can help the technician decide what to check next, such as chilled water availability, valve operation, sensor accuracy or the recent temperature trend. Those displayed values alone do not establish the cause. A well-designed screen supports investigation by presenting the relevant information together.
BMS floor plan graphics help operators locate rooms, HVAC zones and equipment. Where the platform and point data support it, a room or zone can link to the relevant VAV, FCU or AHU screen. Thermographic views can also show temperature conditions using defined colour ranges and a visible legend.
Plan the navigation around the building: start with a building overview, select a floor, locate the affected zone and open its equipment screen. This helps users relate a comfort complaint to the system serving that area.
A static equipment image and an operational BMS screen are different deliverables. Live values require the screen to be connected to the correct control points. Animations, alarm links, trend links and operator commands also need configuration in the target platform.
Before work begins, agree whether the package includes image creation only, complete screen development, database point binding or integration testing. Platform version, licensing, access permissions and available data affect what can be delivered.
Useful inputs include the controls submittal, equipment cutsheets, sequence of operation, equipment tags and the BMS database or point list. Floor plan work also needs the relevant drawings and zone identification. Share the target platform and version, screen requirements and preferred navigation structure.
These inputs help the graphics team represent the actual installation. For example, an AHU with a heating coil and economiser needs a different screen from a cooling-only unit. Equipment names should match across drawings, the database and the operator interface.
Check each screen against the approved controls documents. Confirm sensor locations, equipment tags, units, point bindings and navigation links. Test that fan animation follows the intended status point and that alarm indicators reflect the correct conditions.
Unavailable or unreliable data should have a distinct indication so an operator can recognise it. Where commands are included, verify permissions and command behaviour. Review the finished screens with the facility team on the display they will use.
Uriel Enterprises provides custom 3D HVAC equipment graphics and 2D and 3D floor plan services for building automation projects. We work from project inputs to develop graphics suited to the equipment and the intended operator interface.
Our graphics service page identifies Johnson Controls and Tridium among the controls platforms we support. Share your exact platform, version and integration scope so we can confirm the requirements for your project.
Send your controls submittal, equipment list, drawings and platform details to sales@urielent.com. Let us know whether you need equipment images, complete graphics screens or floor plans so we can review the scope.
Explore Uriel’s custom BMS graphics services
View our floor plan graphics services
October 1, 2026
July 10, 2026
April 2, 2026
February 28, 2026
February 11, 2026
January 30, 2026
January 22, 2026
January 7, 2026
December 29, 2025
December 22, 2025
December 19, 2025
December 16, 2025
December 11, 2025
December 8, 2025
December 5, 2025
December 1, 2025
November 27, 2025
November 22, 2025
November 21, 2025
November 20, 2025
November 19, 2025
November 18, 2025
November 17, 2025
November 15, 2025
November 14, 2025
November 8, 2025
November 7, 2025
November 6, 2025
November 5, 2025
November 4, 2025
November 3, 2025
November 2, 2025
November 1, 2025
October 31, 2025
October 30, 2025
October 28, 2025
October 25, 2025
October 24, 2025
October 23, 2025
October 22, 2025
October 17, 2025
October 16, 2025
October 15, 2025
October 13, 2025
October 10, 2025
October 6, 2025
September 29, 2025
September 26, 2025
September 23, 2025
September 11, 2025
September 3, 2025
September 2, 2025
September 1, 2025
September 20, 2024
September 13, 2024
September 5, 2024
August 31, 2024
August 28, 2024
August 26, 2024
August 25, 2024
August 24, 2024
May 14, 2024